Surplus wire and cable buyers / North Carolina and South Carolina Call or text 614-715-3047 / saleselectricalbuyers@gmail.com
Carolina Electrical Wire Buyers 614-715-3047
HomeSellingTextile plant changeouts and mill cable
Seller situation

Textile plant changeouts and mill cable

A line changeout is minor surgery on a building that was never designed for it. The new drives arrive, the old cabinets come out, and the cable in between is the part nobody scheduled for.

  • Line and drive changeouts
  • Control and motor lead
  • Older mill buildings
warehouse bay with coloured reels of cable stacked around pallets, green steel frame overhead
Partial reels pulled off a job and stacked in the yard.

Replacing a line in a textile plant is not a greenfield installation. The building predates the equipment by decades, the raceways were sized for a different generation of drives, and the cable in the tray has been added to by three different electrical contractors. When the new line goes in, a good deal of the old cable comes out, and it comes out in a state that reflects forty years of service rather than a purchase order.

The mill engineer usually ends up holding it. Production wants the floor clear, the contractor wants to be paid and gone, and the maintenance budget has no line for disposing of several thousand pounds of conductor. That is the moment this page is written for: before the roll-off is ordered and before the cable is mixed with the demolition debris. What happens in that week decides whether the plant recovers anything from the old line at all.

In scope

What we will look at

Not everything in this situation is buyable, and the honest version of the list is more useful than the sales version.

  • VFD and drive cable from old lines
  • Control and instrumentation cable
  • Motor lead and flexible conduit whips
  • Feeder from replaced switchboards
  • Tray cable along the line
  • Copper grounding and bonding conductor
  • Spare reels from the mill store

What a line changeout leaves behind

Three kinds of cable, in three conditions. Spare stock from the mill store, bought for the changeout and not used, still on the reel with a tag. Serviceable cable removed intact, which is rare but real: a feeder pulled out of a raceway in one length is worth reviewing as conductor. And cut cable from the tear-out, which is recovery material and should be treated as such from the first hour rather than the last.

What we need from you when a line comes out

The changeout scope, so we know what was replaced and roughly how much cable that involves. The sizes and types, taken from the old drawings if the cable print is gone. Whether any of it was in a wet location or a washdown area. Where it will be staged and for how long. And who signs, because in a mill that is often a purchasing decision rather than a maintenance one.

Spare reels need separate treatment. Pull the mill store stock out of the changeout pile before anything else happens, photograph the tags, and hold it as inventory. A tagged reel of 500 kcmil that was bought for a job and never installed is the single most valuable item in the building, and it is usually the first thing thrown into the dumpster.

What makes it harder: the building, the humidity and the abatement

Older mills are difficult buildings. Sprinkler systems leak, roofs leak, and a basement full of raceway has probably been wet more than once. Cable that ran through a washdown area may have moisture inside the jacket, and cable stored on a damp floor will wick water up the strands. Both are legitimate reasons for a buyer to downgrade a lot, and neither is visible in a photograph of a coil.

Then there is the structure itself. Asbestos-containing insulation on older wiring, fireproofing on beams, and dust that has settled for decades all affect what can be touched and when. Nothing in a mill should be cut before the abatement survey is done, and a buyer’s crew will not work in an area that has not been cleared. That is a hard line, not a scheduling preference.

Questions sellers ask

Is forty-year-old control cable worth anything?

Usually as recovery material rather than as cable. Old control cable is often small-gauge, sometimes shielded, and its insulation may be brittle enough to crack when it is moved. The copper is real and a buyer will price it, but it will not be reviewed against the cost of new control cable the way a tagged spare reel would be.

Can we sell spare reels from the mill store separately?

You should, and it is usually the most valuable part of the job. Store stock is tagged, uncut and often still wrapped. Selling it with the tear-out drags its value down to the average of the pile. Keep the two lots apart on the floor and describe them as two lots in the same conversation.

What do you need to know about a washdown area?

Whether the cable ran through it, and for how long. Washdown cable is specified for wet locations, but the terminations and splices are where water gets in, and a conductor that has been wet for years will show it at the cut end. Say so up front and the review accounts for it.

Do you remove cable from a mill yourselves?

No. Removal is the mill’s contractor or the mill’s own maintenance crew, under the plant’s safety and abatement rules. We buy material that is down, dry and staged. If a changeout is still in progress, the useful conversation is about staging and separation, so the pile is worth reviewing when it is finished.

Next step

Send the textile plant changeouts and mill cable details

A short description, the quantity, the city and the deadline is enough to start.

Call or text 614-715-3047

Or email saleselectricalbuyers@gmail.com

  • No fee and no obligation to sell.
  • Written lot terms before anything moves.
  • Pickup scheduled around your access rules.
Request a wire quoteTextile plant changeouts and mill cable
Lot details

No fee and no obligation. Nothing is bought, moved or scheduled until written lot terms are agreed. Prefer to talk? 614-715-3047

Call 614-715-3047 Request a Quote